Client
Cerro Vanguardia S.A.
Location
Province of Santa Cruz, Argentina.
Period
1997-1998. |
|
|
Skanska performed the general
management of the project , the revision of basic engineering,
detailed engineering, procurement, administration of contracts,
management of construction, pre-operation and training for
the operations personnel. The mega-project produces gold and
silver, with a processing capacity of 657,000 tons of mineral.
Among the most representative quantities of this project,
we should point out: execution of 300,000 m2 of soil movement,
including 50,0002 m of in rock blasting. The civil works included
13,100 m2 of concrete and 21,000 m2of pavement. Erection,
installation, connection of equipment and supply of E&I.
materials ( 2000 tons of mounted materials). |
|
|
|
|
|