With over 55 years of experience in the industry of power transmission and transformation, Skanska Latin America has become a point of reference in the Region. Among its background in the industry we can mention the laying of more than 15.000 Km. of high and medium voltage transmission lines, as well as the construction of more than twenty 500 kV Transformer Stations and thirty 132 kV Transformer Stations. |
|
 |
|
 |
 |
Cuarta Línea Transmission Line (Comahue - Bs. As.)
Skanska was in charge of the engineering and the management of the Project called Cuarta Línea. The Company
developed the control of the works execution and the verification of compliance with plans related to quality assurance, safety at construction sites and environmental protection. |
 |
Substation for the 500 kV Capex-SADI Interconnection Skanska was responsible for the enlargement of the 132 kV substation and the construction of the new 500 kV substation, needed to permit the interconnection at 500 kV between Agua del Cajón Thermoelectric Power Plant and the Argentine Interconnection System (SADI). |
|
|
|
|
|