Client
Administración Provincial de Energía de La Pampa (APE).

Location
Province of La Pampa, Argentina.

Period
1999–2002.

Skanska executed the civil works, the procurement of all the materials, the electromechanical erection and the start-up of the Macachín 500 kV Transformer Station and the interconnections with Santa Rosa 132 kV Transformer Station. In order to meet the electric demand of the province, this station includes 4 banks of monophasic transformers of 500/132/33 kV of 150/150/50 MVA in a triphasic configuration. The station is completely prepared to be remotely controlled.
 
 
Transmission Lines and Transformer Stations
Back
Overview
Cuarta Línea Transmission Line (Comahue - Bs. As.)
Macachín 500 kV Transformer Station
Zongolica 115 kV Transformer Station and Tierra Blanca TS Enlargement
Substation for the 500 kV Capex-SADI Interconnection
Ponte de Pedra - Rondonópolis Transmission Line
   
   
   
   
   
   
   
   
   
   
 
Skanska LA
Markets & Products >
Hydroelectric and
Thermoelectric
Power Plants
Transmission Lines and
Transformer Stations
Mining
Industrial Plants
Transport and
Communications
Hydric Works
Buildings
Crude Production
Facilities
Gas Production
Facilities
Oil and Gas Pipelines
Refineries
Petrochemical Plants
Oil Services
Maintenance Services