Client
Transener.

Location
Province of Neuquén, Argentina.

Period
1998–1999.

Skanska was responsible for the enlargement of the 132 kV substation and the construction of the new 500 kV substation, needed to permit the interconnection at 500 kV between Agua del Cajón Thermoelectric Power Plant and the Argentine Interconnection System (SADI).
The 132 kV yard was enlarged to allow the connection of the 300 MVA and 500 /132/33 kV transformers, and the elevating transformer of the combined cycle turbo-steam generator.
 
 
Transmission Lines and Transformer Stations
Back
Overview
Cuarta Línea Transmission Line (Comahue - Bs. As.)
Macachín 500 kV Transformer Station
Zongolica 115 kV Transformer Station and Tierra Blanca TS Enlargement
Substation for the 500 kV Capex-SADI Interconnection
Ponte de Pedra - Rondonópolis Transmission Line
   
   
   
   
   
   
   
   
   
   
 
Skanska LA
Markets & Products >
Hydroelectric and
Thermoelectric
Power Plants
Transmission Lines and
Transformer Stations
Mining
Industrial Plants
Transport and
Communications
Hydric Works
Buildings
Crude Production
Facilities
Gas Production
Facilities
Oil and Gas Pipelines
Refineries
Petrochemical Plants
Oil Services
Maintenance Services