Client
Camisea JV (Pluspetrol, Hunt Oil, SK and Tecpetrol).

Location
Pisco, Department of Ica, Peru.

Period
2003–2004.

In order to enable for gas for exports to be loaded from the Camisea field on to the transportation vessels, Skanska was responsible for executing the ducts of the submarine gas loading system for 3.1 km and diameters of 24 and 10 inches. The Company carried out the prefabrication of a set of interconnecting tubes between the Fractioning Plant of fuel in Pisco (EPC2) – that was also executed by the Company – and the loading device located off the coast.
 
 
Oil and Gas Pipelines
Back
Overview
Camisea Flowlines
Loops over the Gral. San Martín Gas Pipeline
Pisco Submarine Gas Pipeline
Buenos Aires-Montevideo Gas Pipeline
Río de Janeiro – Belo Horizonte Gas Pipeline
   
   
   
   
   
   
   
   
   
   
 
Skanska LA
Markets & Products >
Hydroelectric and
Thermoelectric
Power Plants
Transmission Lines and
Transformer Stations
Mining
Industrial Plants
Transport and
Communications
Hydric Works
Buildings
Crude Production
Facilities
Gas Production
Facilities
Oil and Gas Pipelines
Refineries
Petrochemical Plants
Oil Services
Maintenance Services