Client
Transportadora de Gas del Sur (TGS).

Location
Provinces of Chubut and Río Negro, Argentina.

Period
2005.

With the purpose of increasing the transportation capacity of Gral. San Martín gas pipeline in 2.9 million m2 per day, Skanska was hired for the laying of 153 km of parallel loops along the main gas pipeline. The diameter of the laid pipe is 30 inches. The scope of the tasks to be developed by Skanska during an 8-month period included detailed engineering, partial supply of materials, construction, rendering of equipment, and assistance for the start-up.
 
 
Oil and Gas Pipelines
Back
Overview
Camisea Flowlines
Loops over the Gral. San Martín Gas Pipeline
Pisco Submarine Gas Pipeline
Buenos Aires-Montevideo Gas Pipeline
Río de Janeiro – Belo Horizonte Gas Pipeline
   
   
   
   
   
   
   
   
   
   
 
Skanska LA
Markets & Products >
Hydroelectric and
Thermoelectric
Power Plants
Transmission Lines and
Transformer Stations
Mining
Industrial Plants
Transport and
Communications
Hydric Works
Buildings
Crude Production
Facilities
Gas Production
Facilities
Oil and Gas Pipelines
Refineries
Petrochemical Plants
Oil Services
Maintenance Services